Home » Product recommendation – Outage Manager at Paloona Power Station

Product recommendation – Outage Manager at Paloona Power Station

Mathew Hodgetts is Outage Manager for the refurbishment of Hydro Tasmania Pty Ltd’s 26 Hydro plants in Tasmania. Mathew describes the BLH Safety Barricading System as a major factor in their strive for Zero Accidents and the safety of their plants. Within a two years period the barricading system will be installed on all their Hydro Plants. Paloona Power Station and BLH Safety Solutions are setting the required standard.

54 - Tas Power Station